As the leading provider of products and services for heat transfer and thermal storage, BAC has many advanced technologies to minimum the energy consumption. |
 |
|
| CTI Certification |
 |
| - Under design conditions, the energy consumption of cooling tower is only 1/15 of chiller, which is negligible compared with the energy consumption of chiller.? But to compensate for the deficient cooling tower, the chiller’s energy consumption will be several times higher than cooling tower’s,. |
|
| - All BAC product lines are CTI certified, which ensure the chiller of reliable operation and long service life. |
 |
|
| Optimize the Design of Cooling Tower |
 |
| - BAC Patented Fill, which make the heat transfer more efficient |
 |
| - Optimized ratio of G/W |
 |
| High Efficiency Fan Drive? System |
|
| - Standard BALTIDRIVE? Fan Drive System |
 |
| This BAC engineered drive system consists of a specially designed powerband and two cast aluminum sheaves located at minimal shaft centerline distances to maximize belt life. |
|
| - Two Speed Motor (Option) |
| The energy consumption under low heat load is only 1/8 of designed heat load, but the but the performance will reached to 1/2 of designed heat load. |
 |
| - BALTIGUARD?? Fan Drive Systme |
|
| The BALTIGUARD? Fan System consists of two standard singlespeed fan motor and drive assemblies. One drive assembly is sized for full speed and load, and the other is sized approximately 2/3 speed and consumes only 1/3 |
 |
 |